Uncategorized

Septic tank pump ‘Burning out’

Over the years I have encountered many instances where the discharge pump would burn out, every two years or so, sometimes annually. Really a pump should last much longer (some for 10 years or more). So why do they burn out? There are really, only two reasons for this.

1. The pump is not strong enough […]

Attaining standards

Following up on a fellow techie’s recent BRegsForum blog post, lamenting in part the lost opportunity to bring improvement & greater control as promised under SI9.

I’m not sure if the ‘opt out option’ results in a lost opportunity to improve the construction sector. I feel the aims of SI9 can only actually be […]

Building Regulations S.I. 365

The September 1st changes to the Building Regulations or more accurately the Building Control Regulations have been met by and large with great approval, and the news in slowly spreading. For the domestic one-off market March 2014 (S.I. 9) was a crusher as it meant extra costs, piles of paper work and piles of […]

Update to building control regulations

Some major changes to the Building Regulations affecting SI9 have been announced. The most significant change in the latest amendment (referred to as S.I. 365 taking effect from the 1st September) is the “opt out” option for people wishing to build a new house or extension. Meaning people can opt out of S.I. 9 […]

True cost of BER

Not speaking about costs of getting provisional & final BER’s, but more importantly the build cost of what’s proposed in the Provisional BER. The standard approach to insulate well is good advice. But the there is a point where adding more insulation is not cost effective. If Passive standard (again good advice) is not […]

Ventilation

We all know the importance of ventilation, or at least we should. Healthy living means healthy accommodation, and includes ventilation. I know you might feel there is a contradiction here, with building regulations requiring air tight houses while at the same time ordering holes in the walls. But the point of having an air […]

Septic tanks – Part H compliance

For rural projects with stand-alone effluent treatment system, the design and detailing of the system should be carried out at ‘Design’ stage in order to demonstrate compliance with part H of the building regulations. For varies reasons it may become problematic for projects if the design & detailing are not address at this stage.
Crucial […]